Overview

The Lands Tribunal for Scotland has confirmed in EE Limited and Hutchison 3G UK Limited v AP Wireless II (UK) Limited [2026] LTS 29 that a separate contractual notice to quit is not required before a Code renewal under Part 5 of the Electronic Communications Code can be activated, provided a lease is approaching or has passed the earliest date at which it could have been terminated. 

 

The background

The decision concerned the Code renewal of six rural greenfield telecoms leases in Scotland, where EE and H3G were the tenants. The original contractual terms of the leases had expired and the leases were therefore continuing by tacit relocation.

Notices under paragraph 33 of the Code were served by EE and H3G, and Code renewal proceedings were thereafter issued under Part 5 of the Code. The site provider under each of the agreements, AP Wireless, sought to challenge the validity of the P33 notices on the basis that no contractual NTQ had yet been served to trigger contractual termination of each of the leases. This is rooted in the fact that (aside from any Code issues), a Scottish lease continues on a rolling annual basis by tacit relocation unless or until a contractual NTQ has been served. 

AP Wireless' position was that, until contractual notices to quit had been served, the leases remained contractually on foot by tacit relocation and had not therefore reached the point at which the agreements could have been brought to an end by a site provider in line with paragraph 33(3) of the Code. On that basis, APW argued that Part 5 was not yet available to EE and H3G and that the P33 notices, and consequently the Tribunal applications founded upon them, were invalid.

EE and H3G said this approach would, however, impose an additional requirement that did not appear in the Code. The relevant question under paragraph 33(3) was not whether the leases had actually been brought to an end, but whether they had reached the point at which they could have been brought to an end. As the original contractual terms had already expired, and the leases were in principle capable of having been terminated, that threshold was met.

 

The decision

The Tribunal found in favour of EE and H3G and determined that no separate notice to quit is needed before P33/Part 5 of the Code can be activated in Scotland, provided the lease is approaching or has passed the earliest date on which it could have been terminated. The Tribunal recognised that imposing an additional requirement to serve a contractual notice to quit, where no such requirement appears in the Code, could also create a “considerable trap for the unwary”.

The P33 notices were therefore valid and the Tribunal confirmed that it would grant orders in principle terminating the existing agreements and requiring the parties to enter into new Code agreements.

In coming to its decision, the Tribunal considered the Scottish decision in EE Limited v Duncan and Others [2021] CSIH 27 alongside Cornerstone Telecommunications Infrastructure Limited v Compton Beauchamp Limited [2022] UKSC 19 and On Tower UK Limited v British Telecommunications plc [2025] EWCA Civ 844. While recognising that On Tower raised questions around the approach taken in Duncan, it was not persuaded that Duncan had been implicitly overruled or superseded and confirmed that it remained applicable to these Scottish paragraph 33 applications.


Key takeaways

  • No NTQ required: Taken with EE v Duncan, the decision confirms that no separate notice to quit is required before using paragraph 33 of the Code in Scotland, provided the lease is approaching or has passed the earliest date on which it could have been terminated; nor does the termination date need to align with the next contractual ish.
  • Established industry practice is endorsed: The decision adopts a pragmatic approach and provides welcome certainty for the telecoms sector by rejecting an additional notice requirement that could otherwise create a “considerable trap for the unwary".
  • Support for modernising legacy Code agreements: The Tribunal also recalled the Inner House's observation in EE v Duncan that “it is not easy to see how or why a Tribunal could reasonably prefer to prolong an old agreement rather than update it in accordance with the new Code rights”. This supports the use of Part 5 to secure modernised Code agreements rather than simply perpetuating historic terms under legacy agreements.

 

Chloe Postlethwaite, Scottish Lead Partner at DAC Beachcroft, said:

"This is a significant and welcome decision for the Scottish telecoms sector. It provides important clarity on Part 5 renewals and confirms a pragmatic approach to the Code, avoiding additional procedural hurdles that could lead to unintended and potentially absurd outcomes. We are delighted to have acted for the successful parties, EE and H3G, in securing this important result.”

 

Clare Hartley, Client Partner at DAC Beachcroft, said:

“While the judgment turns on the particular Scottish and procedural context, its practical significance extends beyond these individual sites as it provides greater certainty for operators managing established portfolios and a clearer framework for progressing legacy agreements through the Code renewal process. We are pleased to have secured this outcome for EE and H3G, instructed by MBNL, and to continue working alongside them on the strategic management and renewal of their telecoms portfolios."